Workload Optimization

Measure what your applications actually need.

Workload demand drives infrastructure decisions at Opslogix. We establish a baseline first, then use it to guide sizing, placement, and ongoing operations.

From baseline to an infrastructure decision

Establish the performance baseline

Inventory applications and dependencies. Review representative periods such as peak business hours and batch windows. Measure CPU, memory, storage latency and throughput, and network use where data is available.

Find the constraint and compare changes

Compare provisioned resources with observed demand. Identify contention, unused allocations, and growth risk. Model what changes if you resize a workload, refresh hosts, or move it to the cloud with its dependencies.

Verify the change and keep measuring

Check workload behavior against the original baseline after changes. Review recovery needs and remaining headroom. Use recurring reviews to see when demand or dependencies change enough to revisit the plan.

Illustrative sample assessment

A cluster fits one host down and falls short during maintenance.

Baseline: four hosts with 256 GiB of usable RAM each. Peak workload demand is 640 GiB.

ScenarioRemaining RAMMargin at peak
One host down768 GiB128 GiB free
Maintenance plus an outage512 GiB128 GiB short
Add one host, then model the same outage768 GiB128 GiB free

Decision: Compare the cost of one additional host with moving 128 GiB or more of peak demand. Check CPU, storage access, and restart eligibility before approving maintenance.